What Was Shipped (Last 24 Hours)
Completed — 9 of 10 Items
1
Theme Overhaul
Shipped
Purple/gold → teal/aqua ethereal. WebP background + CSS particle overlay.
Your decision D6: Static WebP + CSS particles
2
IR Copilot Fix
Shipped
Investor page no longer shows dev environment. Sign-in/out stays on page.
Bug report CP-7
3
Intent Screen Redesign
Shipped
Icon grid with AI avatar tooltip at key interaction points.
Your decision D3: Scripted responses
4
"What Happens Next" Explainer
Shipped
3-step numbered walkthrough screen added to user onboarding flow.
CP-3: New screen
5
Biometric Scan UX
Shipped
Live heart rate readouts. Processing absorbed into the biometric scan screen.
Your decision D4: Merge into scan
6
Score Reveal Retheme
Shipped
Teal gauge, AI chat bubble, 3 CTAs for next actions.
Your decisions D3 + CP-5
7
Splash Screen
Shipped
Your MP4 optimized and converted to WebM with automatic fallback.
Your decision D5: Video fidelity
8
Eligibility Quiz Restyle
Shipped
Teal theme applied to match new design language throughout.
Your decision D2: Keep + restyle
9
Background
Shipped
WebP image + CSS particle overlay completed with theme overhaul.
D6 (completed with item #1)
Remaining — 1 Item
10
Email Authentication (Phase 2)
In Progress
PR #24 open — +1,614/-64 lines, 23 files. Email-first flow per your D1 + D8 confirmation. Feature-complete; merge conflicts in
.gitignore and IntentFraming.ts being resolved. Apple/Google OAuth added later.Deferred (Per Your Direction)
—
DNA Behavior Integration
Deferred
No engineering started. Activates when business partnership terms are finalized.
Your decision D7: Defer until partnership terms
Pull Request Status
| PR | Title | Status | Notes |
|---|---|---|---|
| #16 | Theme overhaul (teal/aqua) | Merged | |
| #17 | IR Copilot fix | Merged | |
| #18 | Intent screen redesign | Merged | |
| #19 | What Happens Next screen | Merged | |
| #20 | Biometric scan UX merge | Merged | |
| #21 | Score reveal retheme | Merged | |
| #22 | Splash screen (WebM/MP4) | Merged | |
| #23 | Eligibility quiz restyle | Merged | |
| #24 | Email authentication | Open | +1,614/-64 lines, 23 files. Feature-complete. Merge conflicts pending. |
Your 8 Decisions — All Honored
You responded to 8 decisions on March 9. All were incorporated within 24 hours.
| Decision | You Chose | Implementation |
|---|---|---|
| D1: Auth Provider | Email first, then Apple + Google | Email auth in progress (Phase 2) |
| D2: Eligibility Quiz | Keep but restyle | Restyled with teal theme |
| D3: AI Avatar | Scripted at key moments | Avatar tooltip on intent + score screens |
| D4: Processing Screen | Merge into scan | Processing absorbed into biometric scan |
| D5: Splash Animation | WebM/MP4 (video fidelity) | Your MP4 optimized + converted |
| D6: Background | Static WebP + CSS particles | Implemented with theme overhaul |
| D7: DNA Behavior | Defer until partnership | Fully deferred, no work started |
| D8: Demo Scope | Theme + auth + intent redesign | Theme + intent complete, auth in progress |
Deployment Architecture
Your production site is protected while we build. When all items are complete, we swap /test/ to / with zero downtime.
kaleido-life.chem.dev/
Previous production version (unchanged, safe)
kaleido-life.chem.dev/test/
New teal/aqua MVP (active development) — view this now
kaleido-life.chem.dev/investors/
IR Copilot (fixed — sign-in/out stays on page)
This Week by the Numbers
20
Commits
+9,506
Lines Added
8
PRs Merged
<24h
Spec → Ship
Issue Resolution
pie title Issue Resolution (10 Total)
"Closed" : 9
"Open (Email Auth #14)" : 1
Delivery Timeline
MVP Delivery Gantt
gantt
title Kaleido Life MVP — Delivery Timeline
dateFormat YYYY-MM-DD
axisFormat %b %d
section Client Input
Craig's 8 decisions confirmed :done, d1, 2026-03-09, 1d
section Phase 1: Visual MVP
Theme overhaul (D6) :done, p1, 2026-03-09, 1d
IR Copilot fix (CP-7) :done, p2, 2026-03-09, 1d
Intent redesign (D3) :done, p3, 2026-03-09, 1d
What Happens Next (CP-3) :done, p4, 2026-03-09, 1d
Biometric scan UX (D4) :done, p5, 2026-03-09, 1d
Score reveal retheme (D3) :done, p6, 2026-03-09, 1d
Splash screen (D5) :done, p7, 2026-03-09, 1d
Quiz restyle (D2) :done, p8, 2026-03-09, 1d
section Phase 2: Auth
Email auth (D1+D8) :active, p9, 2026-03-09, 3d
Visual QA + promotion :p11, after p9, 2d
section Phase 3: Integrations
DNA Behavior (D7) :crit, p12, after p11, 5d
CSA → ADW Pipeline Flow
sequenceDiagram
participant Craig as Craig (Client)
participant CSA as CSA Pipeline
participant ADW as ADW Agent
participant App as shenAI App
Craig->>CSA: Email + text + mockups
CSA->>CSA: Spec + briefing + input form
CSA->>Craig: 8 design decisions
Craig->>CSA: All 8 confirmed (4:31am)
CSA->>ADW: 10 GitHub issues created
ADW->>App: 8 PRs merged (PRs #16–#23, 9 items shipped)
Note over App: /test/ live with new theme
ADW->>App: Email auth PR (in progress)
App-->>Craig: Production swap when ready
Next Steps
Quick Links
| Resource | URL |
|---|---|
| Live MVP (new) | kaleido-life.chem.dev/test/ |
| Production (old, safe) | kaleido-life.chem.dev/ |
| Investor Relations | kaleido-life.chem.dev/investors/ |
| Technical Briefing v2 | io.noboxai.com/kaleido-shenai-mvp/briefing/v2/ |
| Your Decision Form | io.noboxai.com/kaleido-shenai-mvp/input-form/ |