6 decisions to lock in the next phase. The engine is built — these choices activate it.
The engine is built (177 commits, 18 features, 5 live systems). Ready to activate the revenue layer?
You said "100% want to deploy." When do we start the 2-week build?
578 opportunities already flagged. How should we surface them?
To design automation that replaces 70-80% of the planned hires, we need to know exactly what they'll do.
The biggest bottleneck is human-to-human sync, not engineering. Let's fix that.
Three small admin actions that gate everything. Each takes minutes.