Yesterday's 39-min call did the heavy lifting. Eight locks captured, scope sharpened, naming reset to Blake/Amy. Four open threads remain — lighter form than v1, sharper questions, June 5 standing call lands the rest.
8 Locks Captured 4 Open Threads June 5 Standing CallYesterday's call moved through 39 minutes of substantive territory: the quiz wireframe got live-tested (and pulled forward), pricing dropped from 6% to 5%, the standing call locked on the 5th-of-month, and three new deliverable surfaces opened. v2 reflects that progress as facts; the form below is reduced to four sharp questions.
All flowed from the 5/4 call. Folded into v2 as facts — not asked again.
Amy + Blake + Jonathan. First: 2026-06-05. Aligns with HHE's monthly admin/payouts day. v1 was Tue 5/5 11am
"We just keep five percent." Closer to original proposal. Update PlatformConfig.platformFeePercent. v1 default was 6%
Implicit through the call. "Find a graduate near you" framing. No HHE-aligned expansion in iteration 1.
(a) Lead-magnet — optimize for ease. (b) Comprehensive in-funnel assessment ("set aside 15 min"). Both ship; Lead-magnet first.
NO Pilot/Full split. Iteration 1 goes public-facing with embedded payments at 5%. Internal soak window pre-announce. v1 proposed tiered launch
Tina says 4–6 weeks if focus holds. Q3 revisit when other HHE projects complete. Curated 20-coach model preserved as future option.
Confirmed split. Jonathan to send Blake formal Slack instructions; Amy will echo as official.
Sequence locked. Target: $10K/day ad spend once breakeven on the $27 evergreen course. Replaces $47-only live-event dependency.
v1 had 5 streams. v2 adds Stream 6 (Ask Zuzu Expansion) and reframes Stream 1 / 3 with the call locks.
Lead: Jonathan (back-end) + Blake (front-end)
Single launch with payments at 5% take. Practitioners professional credit-card processing without their own Stripe.
Lead: Amy + Jonathan, Blake on execution
April 10–11 weekend converted strongly. May 15–24 GA retreat anchors next event.
Lead: Jonathan
Quiz A — Lead-Magnet ("Find Your Holistic Health Pathway") — ships May 14. Live-tested by Amy, "really enjoying this."
Quiz B — Comprehensive Assessment — "set aside 15 min" framing. Builds on Quiz A; in-funnel typing tool. Scope after May 14 ship.
Lead: Jonathan, with Lamonte on intake
Mental + physical + finances baseline. Real value compounds over multiple cohorts.
Lead: Jonathan, with Blake on demos
Three delivered items get sunset / refactor / relaunch decisions.
Lead: Jonathan
Three new surfaces opened in 5/4 call. Amy: "Oh wow. That would be incredible."
Items intentionally bracketed out so May/June scope holds.
~100Q pool, serve 20–30 dynamically. Trigger: July post-financial-benchmarks. Concept approved on call.
Charge 50–79, pay 30–40. Deferred until other HHE projects complete (Tina: 4–6 weeks if focus).
Amy didn't engage with the framing. Pull from agenda. Jonathan still pulls partner agreement to verify APY + marketing rights — but no public-facing copy until Amy reactivates.
Amy reframed to single iteration-1 with payments. No internal-only Pilot stage. Soft-launch becomes a soak window.
Reduced surface from v1. Sharper framing where re-asking; new where the call surfaced fresh territory.
Final platform name — Amy + Blake
Practice Near is dropped. Blake suggested it; Amy: "I don't think it makes sense. It's not clear." Jonathan ceded naming authority. Domain decision blocked until name lands.
v1 asked: subdomain on hheonline.com. v2 asks: what's the new name? (Open text — Amy/Blake can paste a list of candidates.)
HIPAA marketing posture — light-touch or aggressive?
Daily.co BAA is in place; Terra health sync built. Practitioner-recruitment copy is being drafted — need posture before send. Capital OS pairing dropped (off-agenda).
v1 asked 3 options + Capital OS pairing. v2 simplifies: 2 options, HIPAA only.
3-item retro week — absorb into June 5 standing call, or schedule before?
Standing call now locked at 5th-of-month. May 19–23 / May 26–30 windows still possible if you want it before June 5 (which is W23, after the original options).
v1 offered May 19–23 / May 26–30 / roll forward. v2 anchors to the locked June 5 cadence.
Standalone Ask Zuzu URL — who's the audience?
You raised it: "Could you make a standalone URL that isn't tied to the library?" Affects auth design + content-leak risk. Three plausible audiences:
Bonus — tonight's team meeting outcome (open text)
Amy promised post-meeting priority list. v3 will re-anchor on it. Drop the list directly here when ready.
June 5 is the new gravitational anchor. Pre-call deliverables in motion; post-call execution flips into full velocity.